Benchmyrk

Glossary

Code freeze

A period before a peak sale when a store stops publishing theme changes, installing apps and starting new tests, so nothing breaks at the busiest time.

Also called change freeze

Changes made just before a peak have the least time to be checked and cost the most if they break something. A freeze sets a date after which only reviewed, low-risk changes go live.

For tests, it means deciding before the freeze which tests run over the peak, and starting no new ones after it.

For exampleExample

A store freezes on 16 November, ten days before Thanksgiving. Its Black Friday offer and two landing page tests are checked and scheduled; everything else waits for December.

Where it comes up

All terms